Services / MFE product range
Furnace Lining & Reconditioning
Refractory lining, furnace repair and reconditioning.
Technical overview
Refractory lining and repair | service specification
View full technical specification ↓Technical specifications, cycle time, capacity, dimensions and safety requirements are finalized against the customer's application. Illustration is for reference only.
Engineering data / MFE
Furnace Lining & Reconditioning — Technical specifications
Refractory lining and repair | service specification. The table provides an indicative quotation basis, not a universal fixed model specification.
| Sr. No. | Parameter | Technical specification |
|---|---|---|
| 01 | Application | Aluminium melting, holding and other approved furnace types |
| 02 | Existing condition | Inspection of shell, lining, anchors and heater/burner interface |
| 03 | Removal | Controlled demolition and removal of worn lining as agreed |
| 04 | Hot face material | Refractory grade selected for operating temperature, alloy and chemical exposure |
| 05 | Insulation | Backup insulation selected for thermal duty |
| 06 | Thickness | Hot-face and insulation thickness by thermal/mechanical design |
| 07 | Shell repair | Fabrication/repair extent confirmed after inspection |
| 08 | Installation | Formwork, mixing, placement and curing per refractory supplier instructions |
| 09 | Dry-out | Controlled refractory dry-out and heating schedule as specified |
| 10 | Quality checks | Material batch, installation condition and lining dimensions |
| 11 | Commissioning | Inspection, heating and trial plan agreed with customer |
| 12 | Scope exclusions | Existing components and site responsibilities confirmed in quotation |
Technical approval & supply scope
Final capacity, dimensions, component makes, utilities, operating performance, safety requirements and scope of supply will be confirmed in the signed quotation and approved drawings. Price, warranty, delivery and commercial conditions are issued separately.
Explore more


